Roof estimate calculator
Free Roof Estimate Calculator
A full asphalt replacement on a 1,700 sq ft house runs $8,497 to $12,795 in 2026, tear-off and permit included. Build your own below. The calculator breaks the estimate into the lines a roofer's written quote uses, prints it as a one-page sheet, and checks up to three quotes against it. It runs in your browser, and nothing you type is sent anywhere.
Build your roof estimate
Enter the footprint of the house, not the roof surface. Every line updates as you change an input.
Estimated total
materials, labor, tear-off, decking and permit
- Roof size
- 19.0 squares
- Materials
- $3,839 – $6,196
- Labor
- $3,780 – $5,115
- Tear-off and disposal
- $727 – $984
- Decking allowance
- Not included
- Permit
- $150 – $500
- Per square of roof
- $447 – $673
Your itemized roof estimate
1,901 sq ft of roof (19.0 squares) over a 1,700 sq ft footprint · 6/12 pitch · Asphalt shingles (architectural) · National average
| Line and what it covers | Low | High |
|---|---|---|
| Materials Shingles or panels, underlayment, ice and water shield, drip edge, starter, ridge cap, vents, flashing and fasteners, as ordered. Itemized below. | $3,839 | $6,196 |
| Installation labor Crew hours at a billed roofing rate for your state, the rate a contractor charges, not the wage. | $3,780 | $5,115 |
| Tear-off and disposal One layer off, hauled away. A second layer prices at half again the first. | $727 | $984 |
| Decking allowance No allowance. Agree the per-sheet rate below in writing anyway. | $0 | $0 |
| Permit National band for a re-roofing permit. Your county sets the real fee. | $150 | $500 |
| Estimated total | $8,497 | $12,795 |
- Rotten decking, per sheet: $62 – $101 per sheet
- One 4×8 sheet replaced: panel, nails and labor. Get this rate written into the contract before tear-off.
- Overhead and profit: $1,578 – $2,439
- Already inside the labor lines above, at 35 to 40% of billed labor. Shown so you can see it, not added to the total.
Not priced: a steep-slope or second-story charge, gutters, skylights, and anything structural. Prices checked October 23, 2026; method at roofcostlab.com/methodology. A planning estimate, not a quote.
Materials, as ordered
The materials line above, item by item: whole bundles, rolls and sticks, with the waste allowance on materials that get cut to fit.
| Material | Qty | Cost |
|---|---|---|
| Asphalt Shingles | 64 BUNDLE | $1,920 – $3,072 |
| Dumpster Rental (Debris Removal) | 1 EA | $350 – $500 |
| ProEdge Estate Gray Hip Ridge Roof Shingles ( 33-lin ft per Bundle ) | 5 EA | $338 – $477 |
| Ice & Water Shield | 5 ROLL | $275 – $475 |
| Roofing Vents | 8 EA | $160 – $400 |
| Roofing Felt (Underlayment) | 9 ROLL | $198 – $360 |
| Starter Strip Shingle Plus Black Starter Roof Shingles ( 105-lin ft per Bundle ) | 5 EA | $200 – $350 |
| 10-in x 50-ft Silver Aluminum Roll flashing | 5 EA | $185 – $261 |
| 2-in x 10-ft Black Galvanized steel Drip Edge | 26 EA | $133 – $188 |
| 2-in Smooth Shank Electro-galvanized Roofing Nails 3817 -Per Box | 2 BOX | $81 – $114 |
Links to retailers are affiliate links: if you buy through one we may earn a commission, and it never changes these figures.
Check a quote against this estimate
Enter the total from each written quote you hold, and the number of squares it states if it gives one. Each is compared with the estimate above and converted to a price per square, the only figure that compares fairly across roofers.
Enter a quote total above to compare it.
| Quote | Total | Per square | Against the estimate |
|---|
How to read a roofer's written estimate
A written roofing estimate should let you rebuild the total from its parts. If it cannot, it is a price rather than an estimate, and a price cannot be compared with anything. Work down it in this order.
- The size. Roofers price by the square, 100 square feet of roof surface, and the quote should say how many squares it covers. Compare that with the sheet above. A count more than about 10% higher deserves a question: dormers, valleys and a generous waste allowance add squares legitimately, while a measurement taken off the floor plan rather than the roof does not.
- Materials by name. "Architectural shingles" is not a specification. The product line and color should be written down, along with the underlayment (synthetic or felt), where the ice and water shield goes, and whether drip edge, starter and ridge cap are new. Substitutions happen where line items are vague.
- Labor and tear-off as separate lines. Installation and removal are different work. A second layer coming off costs about half again the first, so a quote that folds tear-off into one figure should still say how many layers it assumes.
- Disposal and the permit. The dumpster, the haul-away and the permit fee are real costs that someone pays. They belong on the quote, or excluded from it in writing.
- Flashing and ventilation. Whether the step flashing, chimney flashing, pipe boots and vents are reused or replaced. "Reuse where possible" leaves the decision to the crew on the day.
- Warranty and payment. The manufacturer's warranty on the material, the contractor's workmanship warranty on the installation, and a payment schedule. A deposit of 10 to 30% is normal.
Change-order traps to close before you sign
Most disputes on a roofing job are not about the quoted price. They are about what gets added once the old roof is off and the crew is on site, which is exactly when you are least able to say no. Each of these can be priced in writing before the work starts.
- Rotten decking, charged per sheet. Nobody can see the deck until tear-off, so the answer is not to guess how many sheets will fail but to agree the rate. Our dataset puts a replaced 4×8 sheet at $62 to $101 installed. A quote with no per-sheet figure leaves that number to be set on the day, by the person sending the invoice.
- A layer nobody mentioned. If the quote assumes one layer and the crew finds two, removal costs about half again as much. Ask for the price of an additional layer per square before signing.
- "As needed" items. Flashing, vent boots and fascia repairs written as "replace as needed" are open-ended. Ask for a unit price on each.
- Steep or high work. A steep-slope or second-story charge belongs on the original quote as its own line, not on a change order. This calculator does not model it, because published figures vary too widely to price honestly; see the 12/12 pitch page for why it exists.
- Disposal overage. Some quotes cap debris at one dumpster. A heavy tear-off, such as two layers or old wood shakes, can fill a second.
Put the agreed rates in the contract, not in a text message. A change-order rate you agreed while you could still walk away is a very different number from one quoted with your roof open to the sky.
Comparing three quotes on equal terms
Three totals side by side say very little, because three roofers rarely price the same job. One includes a decking allowance, one assumes the second layer stays, one quotes a better shingle. Make the scopes match before comparing the prices.
- Put them on the same size. Divide each total by the squares it states. That price per square, not the total, is the figure to compare, and the checker above does the division for you.
- List what each one leaves out. Tear-off layers, disposal, the permit, decking, ice and water shield, new flashing. Mark every line one quote has and another does not, then ask the others to price it.
- Match the materials. If one quote is for a premium shingle line and the others are not, ask all three for the same line, or at least for the price of the upgrade.
- Weigh the warranties last. A ten-year workmanship warranty against a two-year one is worth paying something for, because most roof failures are installation failures rather than material ones.
A quote well below the other two, and below the estimate here, has usually left something out rather than found a cheaper way to do the work. One well above usually has a reason you can name: a steep roof, difficult access, a premium product, or a contractor with a full schedule. Ask for the reason. A good roofer can give it line by line.
Six questions that protect you before you sign
- Are you licensed here, and can I see the number? Most states license roofing contractors, and the number should be verifiable on your state board's website in under a minute.
- Do you carry general liability and workers' compensation? Ask for certificates, not assurances. Roofing has one of the highest injury rates in construction, and an uninsured worker hurt on your roof can become a claim against your homeowner's policy.
- Who pulls the permit? The contractor should, in their name. A permit pulled by the homeowner generally makes you the party responsible for the work passing inspection.
- Will your own crew do the work? Subcontracting is common and not a problem in itself, but the crew on your roof should be covered by the same insurance and the same workmanship warranty as the company you signed with.
- What does cleanup include? Tarps over planting beds, a magnetic sweep for nails across the yard and driveway, and the debris gone the day the job ends.
- Will you give me lien waivers? In most states an unpaid supplier or subcontractor can file a lien against your house even after you have paid the roofer in full. A lien waiver with each payment closes that door.
Two things that should end a conversation
What other roofing jobs cost in 2026
Not every roof needs replacing. These are computed from the same material and labor dataset as the estimate above, so the figure here and the figure on the linked page agree.
| Job | Priced for | Typical range |
|---|---|---|
| Leak repair Tracing the entry point, then patching the covering, flashing or vent boot that failed. | 100 sq ft | $474 – $687 |
| Emergency tarp Same-day tarp or temporary patch to stop water entering, ahead of a permanent fix. | 100 sq ft | $774 – $1,094 |
| Storm and hail damage Replacing the damaged area once the insurer has scoped it. | 1,000 sq ft | $1,900 – $2,785 |
| Flashing repair Resealing or replacing metal at valleys, chimneys, walls and penetrations. | 20 linear ft | $345 – $536 |
| Deck and sheathing repair Cutting out rotten plywood and laying new sheathing, outside a full replacement. | 400 sq ft | $3,079 – $4,366 |
| Gutter replacement Removing old gutter, forming seamless runs on site, hanging and adding downspouts. | 100 linear ft | $795 – $1,257 |
Planning figures, not quotes. Regional labor, access and disposal fees move them. See how we calculate.